Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6260 Eastman doubles capacity - Coatings World
Suppliers News

Eastman doubles capacity

Eastman Chemical Company will increase capacity at its Kingsport manufacturing facility. The two-phase project will result in doubling of 2-ethyl hexanoic (2-EH) acid from 40 million pounds to 80 million pounds. The first phase of the project is scheduled to be completed during the first quarter of 2005.
2-EH acid is produced by the company’s Eastman division as part of the performance chemical and intermediates segment. The product is used in paint dryers, as well as to produce a plasticizer used in automotive and architectural safety glass

Add us as a preferred source on Google

Get the latest Coatings World news, insights and analysis in your Google Search and AI experiences.

Keep Up With Our Content. Subscribe To Coatings World Newsletters